
Add to Cart
Philippines High Efficiency Tile Adhesives /Wall Putty Production Line Manufacturer
Description
1. This type dry mix mortar plant manufactured by FAIR is manufactured above and below in accordance with the manufacturing process.
2. Energy consumption is very low and covers a small area. Minor pollution of raw materials, on a larger scale, is more suitable for the production of conventional and unique mortar.
3. The integrated waste control system for the dryer plant has been developed by FAIR, which uses Siemens PLC industrial computers and high-speed industrial equipment and world-renowned low-voltage generators.
Fair dry mortar production line can production building materials:
Bonding mortar: Masonry mortar, wall and floor tile adhesive mortar, tile glue, anchorage mortar etc.
Decoration mortar: Decorative plaster, Thin set coating, inner and outer wall putty, Screed mortar, colorful decoration mortar etc.
Protection mortar: Water-proof mortar, anti-corrosion mortar, self-leveling mortar, wear resistance mortar, thermal insulation mortar, sound insulation mortar, AAC jointing mortar, dry sand mixture, repair mortar, mildewproof mortar, shielding mortar etc.
Advantages
1.The screw conveyor takes the material to make sure the delivery speed.
2.Solid and liquid materials can be mixed.
3. Low maintenance rate, low space and low investment.
4. No mixing dead angle.
5. Fast mixing speed.
6. Saving energy and high efficiency.
Packaging
1, HS code can be supplied to you for checking importing tax in your country.
2, Standard export packaging by container, which should be applicable to international requirement.
3, Big size equipment will be fixed by steel wire, while small ones together with spare parts will be packed into wooden boxes.
4, Standard configuration: 2X40HQ container for 1 set 10t/h dry mortar plant.
Shipping
Usually by sea, sometimes by land, air.
Delivery time: 15-30 days after deposit arrived
Our service:
1.With the fastest speed to make the quotation for customers on the prerequisite that we are clear to capacity, quantity, automation requirement, spare parts requirement (Chinese Top Brands or World Grade Brands like Siemens Motors etc), wearing parts requirement,delivery terms etc.
2.Bottom Price for customer as much as possible.
3.Flexible Payment Terms.
4.Offering the analysis of ROI(Return of Investment).
5.1-3 short training periods, 10-15 days installation,1-2days commission,1-2days pre-operation.
6.Total service fees below USD90 for one engineer in one day compared with markets trends USD120.00
7.Shortest periods of processing and manufacturing. For single machines, at most 5days;for production line,at most 15days.
1. Delivery time: 15 days after receipt of your deposit.
2. Payment terms: 30% T/T in advance, the balance is paid (by T/T) before delivery.